Stewart Rd West Phase 2

Breadcrumb

  • > Our Community
  • > Planning & Projects
  • > Stewart Rd West Phase 2

Primary tabs

Stewart Rd West is a 2-lane major arterial road between South Perimeter Way and Swamp Rd, approximately 4.8 km in length. With increased traffic volumes anticipated due to the South Perimeter Way connection and continued growth in the Upper Mission, improvements are needed to ensure an acceptable level of traffic safety and operation. The first phase of this project was constructed in 2019 and the second phase is in the design and planning stage with construction planned for 2025. 

Estimated Cost
$5 million
Phase
Estimated Start
Summer 2025
Estimated End
Summer 2026
Area (lat/long Points)
MULTILINESTRING ((-119.45683135666 49.832056281971, -119.45517911591 49.833744835908), (-119.45517911591 49.833744835908, -119.45512547173 49.835513457157), (-119.45512547173 49.835513457157, -119.45521130242 49.833797284282), (-119.45521130242 49.833797284282, -119.45510401406 49.832953015598), (-119.45510401406 49.832953015598, -119.45443882622 49.83243832061), (-119.45443882622 49.83243832061, -119.45388092675 49.83162863064), (-119.45388092675 49.83162863064, -119.45365562119 49.830915408342), (-119.45365562119 49.830915408342, -119.4527651278 49.830410202847), (-119.4527651278 49.830410202847, -119.45366356035 49.83091292346), (-119.45366356035 49.83091292346, -119.45407662054 49.830708765699), (-119.45407662054 49.830708765699, -119.45453527828 49.830478654649), (-119.45453527828 49.830478654649, -119.45493241977 49.830256995642), (-119.45493241977 49.830256995642, -119.45509335231 49.829987088318), (-119.45509335231 49.829987088318, -119.45510408114 49.829571843341))
Latitude
49.831691580564
Longitude
-119.45463980501
Post to Facebook
Off

Stewart Rd West is a 2-lane major arterial road between South Perimeter Way and Swamp Rd, approximately 4.8 km in length. With increased traffic volumes anticipated due to the South Perimeter Way connection and continued growth in the Upper Mission, improvements are needed to ensure an acceptable level of traffic safety and operation. The first phase of this project was constructed in 2019 and the second phase is in the design and planning stage with construction planned for 2025. 

Estimated Cost
$5 million
Phase
Estimated Start
Summer 2025
Estimated End
Summer 2026
Area (lat/long Points)
MULTILINESTRING ((-119.45683135666 49.832056281971, -119.45517911591 49.833744835908), (-119.45517911591 49.833744835908, -119.45512547173 49.835513457157), (-119.45512547173 49.835513457157, -119.45521130242 49.833797284282), (-119.45521130242 49.833797284282, -119.45510401406 49.832953015598), (-119.45510401406 49.832953015598, -119.45443882622 49.83243832061), (-119.45443882622 49.83243832061, -119.45388092675 49.83162863064), (-119.45388092675 49.83162863064, -119.45365562119 49.830915408342), (-119.45365562119 49.830915408342, -119.4527651278 49.830410202847), (-119.4527651278 49.830410202847, -119.45366356035 49.83091292346), (-119.45366356035 49.83091292346, -119.45407662054 49.830708765699), (-119.45407662054 49.830708765699, -119.45453527828 49.830478654649), (-119.45453527828 49.830478654649, -119.45493241977 49.830256995642), (-119.45493241977 49.830256995642, -119.45509335231 49.829987088318), (-119.45509335231 49.829987088318, -119.45510408114 49.829571843341))
Latitude
49.831691580564
Longitude
-119.45463980501
Post to Facebook
Off
Lat/Long
POINT (-119.45463980501 49.831691580564)