Design only
Primary tabs
Shanks Rd Meter Station
Reekie PRV Upgrade
Stewart Rd West Phase 2
Stewart Rd West is a 2-lane major arterial road between South Perimeter Way and Swamp Rd, approximately 4.8 km in length. With increased traffic volumes anticipated due to the South Perimeter Way connection and continued growth in the Upper Mission, improvements are needed to ensure an acceptable level of traffic safety and operation. The first phase of this project was constructed in 2019 and the second phase is in the design and planning stage with construction planned for 2025.
Stewart Rd West is a 2-lane major arterial road between South Perimeter Way and Swamp Rd, approximately 4.8 km in length. With increased traffic volumes anticipated due to the South Perimeter Way connection and continued growth in the Upper Mission, improvements are needed to ensure an acceptable level of traffic safety and operation. The first phase of this project was constructed in 2019 and the second phase is in the design and planning stage with construction planned for 2025.
Springfield Road, Benvoulin Rd & Dilworth Drive Intersection Improvements
The City of Kelowna is planning to improve the intersection at Springfield Road and Dilworth Drive /Benvoulin Road. Major improvments include dual left turn lanes on Springfield Rd and a right turn lane on Benvoulin Rd from Mayer Rd. Project is currently in design stage and property aquisitions are required to deliver the project. Potential start date is 2026 subject to land aquisition.
Background
The City of Kelowna is planning to improve the intersection at Springfield Road and Dilworth Drive /Benvoulin Road. Major improvments include dual left turn lanes on Springfield Rd and a right turn lane on Benvoulin Rd from Mayer Rd. Project is currently in design stage and property aquisitions are required to deliver the project. Potential start date is 2026 subject to land aquisition.
Background
Shepherd Rd Exchange Expansion
The existing exchange will be enhanced with a new bus bay, passenger platform and customer amenities, sidewalks, a dedicated transit operator washroom, micro-mobility elements and interim park & ride facility.
The new bus bay is located between Asher Rd and Roxby Rd on the south side of the road. The Transit operator washroom will be located on the South West corner of Asher and Shepherd Rd.
Design is underway and construction is anticipated in 2025.
The existing exchange will be enhanced with a new bus bay, passenger platform and customer amenities, sidewalks, a dedicated transit operator washroom, micro-mobility elements and interim park & ride facility.
The new bus bay is located between Asher Rd and Roxby Rd on the south side of the road. The Transit operator washroom will be located on the South West corner of Asher and Shepherd Rd.
Design is underway and construction is anticipated in 2025.