Burtch 2 DCC (Byrns to KLO)
Stewart Rd West Phase 2
Stewart Rd West is a 2-lane major arterial road between South Perimeter Way and Swamp Rd, approximately 4.8 km in length. With increased traffic volumes anticipated due to the South Perimeter Way connection and continued growth in the Upper Mission, improvements are needed to ensure an acceptable level of traffic safety and operation. The first phase of this project was constructed in 2019 and the second phase is in the design and planning stage with construction planned for 2025.
Stewart Rd West is a 2-lane major arterial road between South Perimeter Way and Swamp Rd, approximately 4.8 km in length. With increased traffic volumes anticipated due to the South Perimeter Way connection and continued growth in the Upper Mission, improvements are needed to ensure an acceptable level of traffic safety and operation. The first phase of this project was constructed in 2019 and the second phase is in the design and planning stage with construction planned for 2025.
Springfield Road, Benvoulin Rd & Dilworth Drive Intersection Improvements
The City of Kelowna is planning to improve the intersection at Springfield Road and Dilworth Drive /Benvoulin Road. Major improvments include dual left turn lanes on Springfield Rd and a right turn lane on Benvoulin Rd from Mayer Rd. Project is currently in design stage and property aquisitions are required to deliver the project. Potential start date is 2026 subject to land aquisition.
Background
The City of Kelowna is planning to improve the intersection at Springfield Road and Dilworth Drive /Benvoulin Road. Major improvments include dual left turn lanes on Springfield Rd and a right turn lane on Benvoulin Rd from Mayer Rd. Project is currently in design stage and property aquisitions are required to deliver the project. Potential start date is 2026 subject to land aquisition.
Background