Reconfiguration of the gas main on site. When we were performing valve maintenance in November, a leg of the existing gas main had to be disconnected to allow for that work to be completed. This project aims to reestablish this leg of gas main, with the n Read more about Reconfiguration of the gas main on site. When we were performing valve maintenance in November, a leg of the existing gas main had to be disconnected to allow for that work to be completed. This project aims to reestablish this leg of gas main, with the n
Leckie Pl - Telus shallow utility installation works along Leckie Pl frontage from Just west of Dilworth Dr to Okanagan Rail Trail. TCP to assist cyclists/pedestrians along Rail Trail/Leckie ATC corridor passing active work zone. Read more about Leckie Pl - Telus shallow utility installation works along Leckie Pl frontage from Just west of Dilworth Dr to Okanagan Rail Trail. TCP to assist cyclists/pedestrians along Rail Trail/Leckie ATC corridor passing active work zone.
Co-Op Student - Wastewater and Source Control Read more about Co-Op Student - Wastewater and Source Control