Royal View Transmission Mainline

This capital project will oversee the installation of a new, large diameter water transmission main from the Knox Mountain Reservoirs and will tie-in with existing water infrastructure at the Ethel St and Weddell Pl intersection. Once complete, this new main will help provide additional conveyance capacity and a dedicated source of drinking water to the areas south and east of downtown. As the demand for potable water continues, the new main will be a critical replacement to the currently undersized Royal View Transmission main located atop a slope with known slide risk. 
This capital project will oversee the installation of a new, large diameter water transmission main from the Knox Mountain Reservoirs and will tie-in with existing water infrastructure at the Ethel St and Weddell Pl intersection. Once complete, this new main will help provide additional conveyance capacity and a dedicated source of drinking water to the areas south and east of downtown. As the demand for potable water continues, the new main will be a critical replacement to the currently undersized Royal View Transmission main located atop a slope with known slide risk. 

Raymer Avenue Watermain Renewal - Phase 2

The objective of this project is to upgrade the existing water infrastructure along Raymer Avenue between Ethel Street and Gordon Drive. The existing cast iron watermain, susceptible to costly breaks, will be abandoned in favour of a new PVC main and will eventually tie-in with the utility upgrades that were constructed in conjunction with the Ethel Street ATC project. Residents along Raymer Avenue will also receive a new water service as part of the upgrades.

The objective of this project is to upgrade the existing water infrastructure along Raymer Avenue between Ethel Street and Gordon Drive. The existing cast iron watermain, susceptible to costly breaks, will be abandoned in favour of a new PVC main and will eventually tie-in with the utility upgrades that were constructed in conjunction with the Ethel Street ATC project. Residents along Raymer Avenue will also receive a new water service as part of the upgrades.

City Park - Phase 3

The City will be starting work on Phase 3 of City Park improvements. Improvements include a separated pedestrian and active transportation pathways, plazas, Ogopogo short relocation and ground improvements, modification to the fountain at the Sails, relocated dog beach, benches, lighting, landscaping, new water access points, foreshore improvements and respective utilities upgrades.  Detours will be in place to support pedestrians and cyclists.  

The City will be starting work on Phase 3 of City Park improvements. Improvements include a separated pedestrian and active transportation pathways, plazas, Ogopogo short relocation and ground improvements, modification to the fountain at the Sails, relocated dog beach, benches, lighting, landscaping, new water access points, foreshore improvements and respective utilities upgrades.  Detours will be in place to support pedestrians and cyclists.  

Glenmore Recreation Park - Ph 5

Glenmore Recreation Park is a recreation park in the north end of the city that will provide residents with recreation and community facilities. The park is a multi-year construction project. Phase 1, involved site grading, drainage infrastructure and buffering of adjacent agricultural land in 2017. Phase 2 included construction of the 2 sports fields and Phase 3 included the construction of the internal roadway and parking for the sport fields, completed in 2021.
Glenmore Recreation Park is a recreation park in the north end of the city that will provide residents with recreation and community facilities. The park is a multi-year construction project. Phase 1, involved site grading, drainage infrastructure and buffering of adjacent agricultural land in 2017. Phase 2 included construction of the 2 sports fields and Phase 3 included the construction of the internal roadway and parking for the sport fields, completed in 2021.

Lakeshore 4 (Richter to Lanfranco)

The City is planning improvements to Lakeshore Rd between Richter St and Lanfranco Rd in 2025. Works include improving sidewalk connectivity along the east side between the new Caban development and Lanfranco Rd, new street trees, new crosswalk at the Gyro beach parking lot access and road asphalt renewal.

Design and property acquisition underway with anticipated construction in 2025.
The City is planning improvements to Lakeshore Rd between Richter St and Lanfranco Rd in 2025. Works include improving sidewalk connectivity along the east side between the new Caban development and Lanfranco Rd, new street trees, new crosswalk at the Gyro beach parking lot access and road asphalt renewal.

Design and property acquisition underway with anticipated construction in 2025.

Mission Activity Centre Transit Exchange Upgrade

Detailed design is underway for improvements to the existing transit exchange to better separate transit operations and the public and provide additional transit bays.

Construction anticipated in 2026.
Detailed design is underway for improvements to the existing transit exchange to better separate transit operations and the public and provide additional transit bays.

Construction anticipated in 2026.