Pre-construction
Primary tabs
Chute Lake Rd (South Crest Dr- Frost Rd) Resurfacing
Old Vernon Rd (Rutland Rd- City Limits) Resurfacing
Glenmore Rd (Glenmeadows Rd- Dallas Rd) Resurfacing
Royal View Transmission Mainline
Raymer Avenue Watermain Renewal - Phase 2
The objective of this project is to upgrade the existing water infrastructure along Raymer Avenue between Ethel Street and Gordon Drive. The existing cast iron watermain, susceptible to costly breaks, will be abandoned in favour of a new PVC main and will eventually tie-in with the utility upgrades that were constructed in conjunction with the Ethel Street ATC project. Residents along Raymer Avenue will also receive a new water service as part of the upgrades.
The objective of this project is to upgrade the existing water infrastructure along Raymer Avenue between Ethel Street and Gordon Drive. The existing cast iron watermain, susceptible to costly breaks, will be abandoned in favour of a new PVC main and will eventually tie-in with the utility upgrades that were constructed in conjunction with the Ethel Street ATC project. Residents along Raymer Avenue will also receive a new water service as part of the upgrades.
City Park - Phase 3
The City will be starting work on Phase 3 of City Park improvements. Improvements include a separated pedestrian and active transportation pathways, plazas, Ogopogo short relocation and ground improvements, modification to the fountain at the Sails, relocated dog beach, benches, lighting, landscaping, new water access points, foreshore improvements and respective utilities upgrades. Detours will be in place to support pedestrians and cyclists.
The City will be starting work on Phase 3 of City Park improvements. Improvements include a separated pedestrian and active transportation pathways, plazas, Ogopogo short relocation and ground improvements, modification to the fountain at the Sails, relocated dog beach, benches, lighting, landscaping, new water access points, foreshore improvements and respective utilities upgrades. Detours will be in place to support pedestrians and cyclists.
Glenmore Recreation Park - Ph 5
Lakeshore 4 (Richter to Lanfranco)
Design and property acquisition underway with anticipated construction in 2025.
Design and property acquisition underway with anticipated construction in 2025.
Mission Activity Centre Transit Exchange Upgrade
Construction anticipated in 2026.
Construction anticipated in 2026.