Clement Ave 647 - Sidewalk closure along Clement Ave. to allow for excavation of building which requires existing sidewalk removal, backfill ,and re-in statement of sidewalk to city standards. Existing sidewalk is 60m x 1.2 = 79m2. Please refer to attache