Current capital projects
Primary tabs
We're working to create vibrant urban centres, a balanced transportation network and an inclusive community. Infrastructure projects improve and maintain outdoor spaces, buildings, active transportation networks, utilities, roads and bridges.
The City is planning improvements to Lakeshore Rd between Richter St and Lanfranco Rd in 2025.
Est. start: 2025 TBD
Est. end: 2025 TBD
Sanitary trunk main capacity upgrades are planned from Swordy Rd to Cook Road to accommodate growth in the City.
Est. start: 2025
Est. end: 2027
Mission Activity Centre Transit Exchange UpgradeTransit infrastructure
Detailed design is underway for improvements to the existing transit exchange to better separate transit operations and the public and provide additional transit bays.
Est. start: 2024
Est. end: fall 2026
Project Overview:
Est. start: Summer 2025
Est. end: Fall 2025
This multi-year project will redirect the sanitary flows within the local catchment from the Guy Street Lift Station to the Brandt’s Creek Lift Station on Ethel St at Weddell Pl to balanc
Est. cost: $2.3 million
Est. start: Spring 2025
Est. end: Summer 2025
This multi-year project will redirect the sanitary flows within the local catchment from the Guy Street Lift Station to the Brandt’s Creek Lift Station on Ethel St at Weddell Pl to balance flow patter
Est. cost: $1.8 million
Est. start: Summer 2025
Est. end: Fall 2025
Old Vernon Rd (Rutland Rd- City Limits) ResurfacingPavement Management
Milling and paving of roadway.
Est. start: Spring 2025
Est. end: Fall 2025
Prospera Place ImprovementsBuildings or Facilites
This project addresses end of life equipment replacements and upgrades relating to the Memorial Cup bid requirements at Prospera Place.
Est. cost: $3.96 Million
Est. start: Spring 2025
Est. end: Fall 2025
The objective of this project is to upgrade the existing water infrastructure along Raymer Avenue between Ethel Street and Gordon Drive.
Est. cost: $850,000
Est. start: July 2025
Est. end: September 2025
Reekie PRV UpgradeUtilities
This project will oversee the replacement of the aging Reekie pressure reducing valve (PRV) station with a new facility that meets the current demands on Kelowna's non-potable irrigation water in
Est. cost: $1 million
Est. start: Summer 2025
Est. end: Winter 2025