North End Sanitary Catchment Realignment - Phase 1

Breadcrumb

  • > Our Community
  • > Planning & Projects
  • > North End Sanitary Catchment Realignment - Phase 1

Primary tabs

This multi-year project will redirect the sanitary flows within the local catchment from the Guy Street Lift Station to the Brandt’s Creek Lift Station on Ethel St at Weddell Pl to balance flow patterns.
In 2025 Phase 1 will consist of installation of new sanitary sewer pipe along Ethel Street (between Weddell Pl and Bay Ave) as well as along Bay Ave (between Ethel St and Jones St). Pettigrew St as well as a small section of Crowley Ave will also have new sanitary sewer installed. 

Category
Estimated Cost
$2.3 million
Estimated Start
Spring 2025
Estimated End
Summer 2025
Area (lat/long Points)
MULTILINESTRING ((-119.48282567931 49.896270695693, -119.48280422164 49.898205801563), (-119.48280422164 49.898205801563, -119.48278276396 49.899242433499), (-119.48278276396 49.899242433499, -119.48492853118 49.899242433499))
Latitude
49.898240341064
Longitude
-119.48333529902
Post to Facebook
Off

This multi-year project will redirect the sanitary flows within the local catchment from the Guy Street Lift Station to the Brandt’s Creek Lift Station on Ethel St at Weddell Pl to balance flow patterns.
In 2025 Phase 1 will consist of installation of new sanitary sewer pipe along Ethel Street (between Weddell Pl and Bay Ave) as well as along Bay Ave (between Ethel St and Jones St). Pettigrew St as well as a small section of Crowley Ave will also have new sanitary sewer installed. 

Category
Estimated Cost
$2.3 million
Estimated Start
Spring 2025
Estimated End
Summer 2025
Area (lat/long Points)
MULTILINESTRING ((-119.48282567931 49.896270695693, -119.48280422164 49.898205801563), (-119.48280422164 49.898205801563, -119.48278276396 49.899242433499), (-119.48278276396 49.899242433499, -119.48492853118 49.899242433499))
Latitude
49.898240341064
Longitude
-119.48333529902
Post to Facebook
Off
Lat/Long
POINT (-119.48333529902 49.898240341064)